Dehua Joy Art Est. Dehua
Capability

What we actually control.

We are a trading company, not a factory, and we do not pretend otherwise. What we control is which workshop a design goes to, what the spec says, and what happens when the two disagree. Everything below is about that.

Supply base

The workshop network

Dehua county runs on small workshops. Size is not the signal — what material the kiln fires every week is.

Material match first

A kiln that fires white porcelain daily will hold your wall thickness. A kiln that mostly runs stoneware will not, however good the sample looks.

Capacity check

We confirm the firing queue before committing a delivery date. Small workshops have one kiln; a booked kiln means a late order.

Fallback kept warm

Every programme has a second workshop that has already quoted it, so a failure at one kiln does not restart the whole development.

Development

Moulds, tooling and decoration

01

Existing mouldsFastest, cheapest route

Most categories have shapes already tooled in the workshops. Reusing a mould removes tooling cost and shortens lead time, at the price of less shape freedom.

No tooling charge · shorter lead time · glaze and decal still open

02

New toolingWhen the shape is the product

Mould cost is quoted separately and stated as a one-off. We tell you whether the mould stays with the workshop or is yours, in writing, before it is cut.

One-off cost · sample rounds · shrinkage allowance

03

DecorationDecal / hand-paint / glaze

Decal gives repeatable multi-colour artwork; hand-paint gives variation that reads as craft; glaze dipping is the cheapest surface and the hardest to keep consistent.

Artwork files · colour matching · food-contact compliance

Delivery

Inspection, packing, terms

Ceramics break. The only honest measure of packing is what arrives intact.

Inspection

Pre-production sample signed off first; then an in-line check and a final inspection before packing. Breakage and glaze defects are counted against an agreed AQL.

Packing

Inner box, divider and outer carton are specified per item. Drop test on request. Mixed cartons and mixed containers are both possible.

Terms

FOB and EXW are our default. Payment and lead time are stated per order once the item list and packing are fixed — not quoted as a blanket number.

01

Brief

Category, target price, finish. A photo is enough to start the conversation.

02

Feasibility

We come back on what is possible in that material at that price, before any tooling.

03

Sample

Sample against a written spec, photographed from four angles, sent for approval.

04

Ship

Production, inspection, packing, documents. FOB or EXW.

Development brief

Send the awkward one.

If a design has already failed somewhere else, that is usually the most useful thing you can send us. Tell us what went wrong and we will tell you whether it is the mould, the kiln, or the packing.

Talk to us